聯系我們
濟南富強門業(yè)有限公司
聯系人:林經理
電話:151 6888 2846
郵箱:527800164@qq.com
地址:濟南市歷下區(qū)化纖廠路8號3號樓101號
保證卷簾門安裝質量方式
來源:http:// 日期:2021-12-06 發(fā)布人:
卷簾門施工工藝程序
Construction process procedure of rolling shutter door
(1)手動卷簾門工藝程序:定位、放線一安裝卷筒一安裝手動機構一簾板與卷筒連接一安裝導軌一試運轉一安裝防護罩。
(1) Process procedure of manual rolling shutter door: positioning and setting out - Installation of drum - Installation of manual mechanism - connection between curtain plate and drum - Installation of guide rail - Test Run - Installation of protective cover.
(2)電動卷簾門工藝程序:定位、放線_安裝卷簡一安裝電機、減速器一安裝電氣控制系統(tǒng)一空載試車一簾板與卷筒連接_安裝導軌一安裝水幕噴啉系統(tǒng)一試運轉一安裝防護罩。
(2) Process procedure of electric rolling shutter door: positioning and setting out_ Installation of winding sheet - Installation of motor and reducer - Installation of electrical control system - no-load commissioning - connection between curtain plate and winding drum_ Install the guide rail, install the water curtain spraying system, test run and install the protective cover.
2.定位放線卷簾門安裝方式有洞內安裝、洞外安裝、洞中安裝三種。即卷簾門裝在門洞內,簾片向內側卷起;卷簾門裝在門洞外,簾片向外卷起和卷簾門裝在門洞中,簾片可向外側或向內側卷起。因此,定位放線時應根據設計要求彈出兩導軌垂直線及卷簡線并測量洞口標高。定位放線后,應檢查實際預埋鐵件的數量、位置與圖紙核對,如不符合產品說明書的要求,應進行處理。
2. There are three installation modes of positioning and setting out roller shutter door: installation inside the tunnel, installation outside the tunnel and installation in the tunnel. That is, the rolling shutter door is installed in the door opening, and the curtain sheet is rolled up to the inside; The rolling shutter door is installed outside the door opening, the curtain sheet is rolled outward, and the rolling shutter door is installed in the door opening, and the curtain sheet can be rolled outward or inward. Therefore, during positioning and setting out, the vertical lines of the two guide rails and the winding center line shall be snapped according to the design requirements, and the elevation of the opening shall be measured. After positioning and setting out, the quantity and position of the actual embedded iron parts shall be checked and checked with the drawings. If they do not meet the requirements of the product manual, they shall be handled.
3.安裝卷筒安裝卷筒時,應使卷筒軸保持水平,并使卷筒與導軌之間距離兩端保持一致,卷筒臨時固定后進行檢查,調整、校正合格后,與支架預埋鐵件用電焊焊牢。卷筒安裝后應轉動靈活。
3. Install the drum. When installing the drum, keep the drum shaft horizontal and keep the distance between the drum and the guide rail consistent at both ends. After the drum is temporarily fixed, check it. After adjustment and correction are qualified, weld it firmly with the embedded iron parts of the support by electric welding. The drum shall rotate flexibly after installation.
4.簾板安裝簾板事先裝配好,再安裝在卷筒上。門簾板有正反向,安裝時要注意,不得裝反。
4. Curtain plate installation the curtain plate shall be assembled in advance and then installed on the drum. The door curtain plate has positive and negative directions. Attention shall be paid during installation, and it shall not be installed reversely.
5.安裝導軌按圖紙規(guī)定位置線找直、吊正軌道,保證軌道槽口尺寸準確,上下一致,使導軌在同一垂直平面上,然后用連接件與墻體上的預埋鐵件焊牢。
5. Install the guide rail, align and hang the rail according to the position line specified in the drawing, ensure that the size of the rail notch is accurate and consistent up and down, make the guide rail on the same vertical plane, and then weld it firmly with the embedded iron parts on the wall with connectors.
6.安裝水幕噴淋系統(tǒng)防火卷簾門應安裝水幕噴淋系統(tǒng)。水幕噴淋系統(tǒng),應與總控制系統(tǒng)連接。安裝后,應試驗。
6. Install the water curtain spraying system. The fireproof rolling shutter door shall be installed with the water curtain spraying system. The water curtain spray system shall be connected with the main control system. After installation, the test shall be carried out.
7.試運轉先手動試運行,再用電動機啟閉數次,調整無卡住、阻滯及異常噪聲等現象為合格。
7. The test run shall be conducted manually first, and then the motor shall be opened and closed for several times. It is qualified if there is no jamming, block and abnormal noise.
8.安裝卷筒防護罩
8. Install the drum guard
The above wonderful content is what Xiaobian provides for you today. More wonderful content comes from Jinan roller shutter door. For details, please click our website to pay attention to: http://
下一篇:防火卷簾門的材質可以使用哪些? 上一篇:卷簾門的危害有多大,正確選擇卷簾門來防患
閱讀/ Recommended reading
- 濟南卷簾門:斷掉一片后的處理方法,你學會了嗎? 2024-11-19
- 如何延長卷閘門的壽命 2024-11-06
- 重視卷簾門門口堆物問題 2024-11-06
- 快速卷簾門介紹與快速卷簾門材料說明 2024-10-26
- 濟南卷簾門廠:卷簾門安裝施工工藝詳解 2024-10-14
- 濟南卷簾門安裝秘籍,讓家居更有面子 2024-09-21
- 濟南遙控卷簾門:我來教你——卷閘門遙控器遇到故障怎么辦? 2024-08-28
- 濟南卷簾門:卷簾門(不銹鋼款) 2024-07-25
濟南卷簾門:門鎖上了該怎么解鎖?
2024-11-23
如果您遇到了卷簾門鎖住的情況,這里有一些可能的解鎖方法: If you encounter a situation where the rolling shutter doo...