新聞資訊
聯(lián)系我們
濟(jì)南富強(qiáng)門(mén)業(yè)有限公司
聯(lián)系人:林經(jīng)理
電話(huà):151 6888 2846
郵箱:527800164@qq.com
地址:濟(jì)南市歷下區(qū)化纖廠(chǎng)路8號(hào)3號(hào)樓101號(hào)
卷簾門(mén)尺寸多少參考介紹
來(lái)源:http:// 日期:2022-07-19 發(fā)布人:
卷簾門(mén)適用于各類(lèi)商店和、賓館、銀行醫(yī)院、學(xué)校、機(jī)關(guān)、廠(chǎng)礦、車(chē)站、碼頭、倉(cāng)庫(kù)、變電室及工業(yè)廠(chǎng)房等裝璜設(shè)施。卷簾門(mén)窗啟閉通常采用手動(dòng)、電動(dòng)兼手動(dòng)或自動(dòng)開(kāi)啟方式,正常情況下門(mén)窗電動(dòng),遇臨時(shí)停電或其它情況則手動(dòng)開(kāi)閉。下面來(lái)講講卷簾門(mén)尺寸多少吧。
Roller shutter doors are suitable for all kinds of shops and shopping malls, hotels, banks, hospitals, schools, institutions, factories and mines, stations, wharves, warehouses, transformer rooms and industrial plants and other decoration facilities. The rolling shutter doors and windows are usually opened and closed manually, electrically and manually or automatically. Under normal circumstances, the doors and windows are electrically operated, and in case of temporary power failure or other circumstances, they are manually opened and closed. Now let's talk about the size of roller shutter door.
卷簾門(mén)尺寸:
Roller shutter door size:
1、防火卷簾門(mén)的安裝分為內(nèi)裝和外裝,h:代表洞口高;w:代表洞口寬。內(nèi)裝尺寸計(jì)算公式:w×(h+預(yù)卷+封箱)×單價(jià)。外裝尺寸計(jì)算公式:w×(h+外跨尺寸+預(yù)卷+封箱)×單價(jià)。說(shuō)明:外跨尺寸:0.4m、預(yù)卷:0.6m。
1. The installation of fireproof rolling shutter door is divided into internal installation and external installation, h: represents the height of the opening; w: Represents the opening width. Calculation formula of interior dimension: W × (h+ pre roll + box sealing) × Unit Price. Calculation formula of external dimension: W × (h+ outer span size + pre winding + sealing box) × Unit Price. Note: outer span size: 0.4m, pre roll: 0.6m.
2、防火卷簾門(mén)封箱分為:三面和二面。三面封箱:高度要加1.6m,二面封箱:高度要加1.0m。例如:洞口尺寸為:3m*2m。內(nèi)裝二面封箱面積為:3×(2+0.6+1.0)=10.8平米。外裝二面封箱面積為:3×(2+0.4+0.6+1.0)=12平米。
2. The sealing box of fireproof rolling shutter door is divided into three sides and two sides. Three side sealing: the height should be increased by 1.6m, and two side sealing: the height should be increased by 1.0m. For example, the opening size is 3m*2m. The sealing area of two sides inside is: 3 × (2 + 0.6 + 1.0) = 10.8 square meters. The sealing area of the external two sides is: 3 × (2 + 0.4 + 0.6 + 1.0) = 12 square meters.
卷簾門(mén)安裝注意事項(xiàng):
Precautions for installation of roller shutter door:
1、按設(shè)計(jì)型號(hào),查閱產(chǎn)品說(shuō)明書(shū)和電氣原理圖。檢查產(chǎn)品表面處理和零附件。量測(cè)產(chǎn)品各部位基本尺寸。檢查門(mén)洞口是否與卷簾門(mén)尺寸相符;導(dǎo)軌、支架的預(yù)埋件位置、數(shù)量是否正確。
1. Refer to the product manual and electrical schematic diagram according to the design model. Check the product surface treatment and accessories. Measure the basic size of each part of the product. Check whether the door opening is consistent with the size of the roller shutter door; Whether the position and quantity of embedded parts of guide rail and support are correct.
2、測(cè)量洞口標(biāo)高,彈出兩導(dǎo)軌垂線(xiàn)及卷筒線(xiàn)。
2. Measure the elevation of the hole, and snap the vertical line of the two guide rails and the center line of the drum.
3、將墊板電焊在預(yù)埋鐵板上,用螺絲固定卷筒的左右支架,安裝卷筒。卷筒安裝后應(yīng)轉(zhuǎn)動(dòng)靈活。
3. Weld the backing plate on the embedded iron plate, fix the left and right supports of the drum with screws, and install the drum. The drum shall rotate flexibly after installation.
4、安裝減速器和傳動(dòng)系統(tǒng)。
4. Install the reducer and drive system.
5、安裝電氣拴街系統(tǒng)。
5. Install electrical tie down system.
6、空載試車(chē)。
6. No load commissioning.
7、將事先裝配好的簾板安裝在卷筒上。
7. Install the curtain plate assembled in advance on the drum.
8、安裝導(dǎo)軌。按圖紙規(guī)定位置,將兩側(cè)及上方導(dǎo)軌焊牢于墻體預(yù)埋件上,并焊成以體,各導(dǎo)軌應(yīng)在同一垂直平面上。
8. Install the guide rail. According to the position specified in the drawing, weld the guide rails on both sides and above to the embedded parts of the wall, and weld them into a body. Each guide rail should be on the same vertical plane.
9、安裝水幕噴淋系統(tǒng),并與總控制系統(tǒng)連接。
9. Install the water curtain spray system and connect it with the main control system.
10、試車(chē)。先用手去試運(yùn)行,再用電動(dòng)機(jī)啟閉數(shù)次,調(diào)整無(wú)卡住、阻滯及異常噪音等現(xiàn)象為止。全部調(diào)試完畢,安裝防護(hù)罩。
10. Commissioning. Test run by hand first, and then open and close the motor several times until there is no jamming, blocking, abnormal noise and other phenomena. After all commissioning, install the protective cover.
11、安裝防護(hù)罩。濟(jì)南卷簾門(mén)卷筒上的護(hù)罩可做成方形,亦可做成半圓形。護(hù)罩的尺寸大小應(yīng)與門(mén)的寬度和門(mén)條板卷起后的直徑相適應(yīng),保證卷筒將門(mén)條板卷滿(mǎn)后與護(hù)罩仍保持一定的距離,不得相互碰撞,經(jīng)檢查無(wú)誤后,再與護(hù)罩預(yù)埋件焊牢。
11. Install the protective cover. The shield on the drum of Jinan roller shutter door can be made into a square or a semicircle. The size of the shield should be consistent with the width of the door and the diameter of the door slat after it is rolled up, so as to ensure that the drum still keeps a certain distance from the shield after the door slat is rolled up, and shall not collide with each other. After inspection, it can be firmly welded with the embedded parts of the shield.
卷簾門(mén)尺寸多少?以上就是問(wèn)題的相關(guān)內(nèi)容了,僅供參考,您可以根據(jù)自己的實(shí)際情況來(lái)考慮。更多事項(xiàng)就來(lái)網(wǎng)站咨詢(xún)http://了解吧。
What is the size of the roller shutter door? The above is the relevant content of the problem, for reference only, you can consider it according to your actual situation. For more information, please come to the website for consultation http:// Understand.
閱讀/ Recommended reading
- 濟(jì)南卷簾門(mén):斷掉一片后的處理方法,你學(xué)會(huì)了嗎? 2024-11-19
- 如何延長(zhǎng)卷閘門(mén)的壽命 2024-11-06
- 重視卷簾門(mén)門(mén)口堆物問(wèn)題 2024-11-06
- 快速卷簾門(mén)介紹與快速卷簾門(mén)材料說(shuō)明 2024-10-26
- 濟(jì)南卷簾門(mén)廠(chǎng):卷簾門(mén)安裝施工工藝詳解 2024-10-14
- 濟(jì)南卷簾門(mén)安裝秘籍,讓家居更有面子 2024-09-21
- 濟(jì)南遙控卷簾門(mén):我來(lái)教你——卷閘門(mén)遙控器遇到故障怎么辦? 2024-08-28
- 濟(jì)南卷簾門(mén):卷簾門(mén)(不銹鋼款) 2024-07-25
濟(jì)南卷簾門(mén):門(mén)鎖上了該怎么解鎖?
2024-11-23
如果您遇到了卷簾門(mén)鎖住的情況,這里有一些可能的解鎖方法: If you encounter a situation where the rolling shutter doo...